Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | Chengdu |
---|---|
Brand Name: | Libre |
Certification: | ISO9001 |
Model Number: | Knife |
Minimum Order Quantity: | 10pcs |
Price: | USD 80~150/pc |
Packaging Details: | Carton box |
Delivery Time: | 20~40 business days |
Payment Terms: | T/T, Western Union, MoneyGram,PayPal |
Supply Ability: | 100pcs per month |
Material: | TCT | Part Number: | 406.13.2333 |
---|---|---|---|
Application: | For Focke Machine | ||
High Light: | Focke 406 Packing Machine Spare Parts,Focke 406 Packing Machine TCT blades |
Focke 406 Packing Machine Spare Parts Knife 406.13.2333 -1
For Focke, mainly we manufacture spare parts for Focke 350 packing machine. we are a leading manufacturer
of an extensive range of spare parts for all types of cigarette making machines (cigarette makers), cigarette
packing machines (cigarette packers), tobacco cutting machines (tobacco cutters), offering global customers
with quality replacement parts of HAUNI PROTOS, GD, PASSIM, MOLINS, BE, FOCKE, etc.
Some of our spare parts are in stock. Meantime, we strive to deliver a flexible solution to meet your manufacturing
requirements, if you cannot find what you are looking for on our website please feel free to contact us !
Focke Knife Display:
Other more spare parts:
1). Quality Inspection and Warranty
Our products are strictly checked over 20 inspection process from powder to finished products. We can keep and improve our quality, and are very pleased to hear that customers are satisfied with Libre’s products.
2). OEM &ODM Service is highly welcomed.
Customized Logo/Brand;
Help products design;
3). When the order is confirmed, all the drawings and samples will be converted into CAD drawing. We will arrange time schedule for producing customer order after design drawings are confirmed by both parties. During the producing period, we will update tracking and recording progress and feedback to customers regularly.